Back Up Prod Before Every Deploy: A GitHub Actions Gate You Can't Skip

Every schema migration is a small act of faith. You run it, the app boots, and usually it's fine. But the one time it isn't — a bad Liquibase changeset, a column drop that shouldn't have shipped — you want a restore point from seconds before the migration, not from last night's 3 AM backup.

We already had a nightly backup. What we didn't have was a backup tied to the deploy — and, more importantly, a deploy that refuses to proceed if the backup fails. Here's how we wired that up.

TL;DR

  • Reuse your existing backup workflow via workflow_call — don't duplicate the logic.
  • Gate the deploy on the backup job with needs:. A failed backup skips the deploy. No migration without a restore point.
  • If you deploy via image-pull (Watchtower, Flux, etc.), the trick is to push an immutable tag first and promote the "watched" tag last — so the backup runs between build and go-live.

The deploy mechanism matters

Our backend deploys with Watchtower: CI pushes an image to the registry, and a Watchtower container on the droplet polls, pulls :latest, and restarts the app. Liquibase migrates on startup.

That detail is the whole game. The migration happens when :latest changes — roughly 60 seconds after we push it, not when CI finishes. So a "pre-deploy" backup has to complete before that tag moves.

The naive version — take the backup as the first job, then build+test+push — technically works, but it's wasteful and wrong-ordered:

  • If the test suite fails, you took a backup for a deploy that never happened.
  • The backup is now several minutes stale by the time the migration actually runs.

What we actually want is: build & test → backup → go live.

Step 1: Make the backup reusable

Our nightly backup already did the hard, sensitive parts — pg_dump of a DigitalOcean Managed Postgres schema, upload to Spaces, and a firewall dance that temporarily trusts the runner's IP (with a preflight that refuses to run if it would lock production out). Duplicating that into the deploy pipeline would be asking for trouble.

Instead, we added a workflow_call trigger to the existing workflow so it can be called as well as scheduled:

on:
  schedule:
    - cron: '0 3 * * *'
  workflow_dispatch:
  workflow_call:
    inputs:
      prefix:
        type: string
        default: db-daily-backup
      lifecycle_days:
        type: number
        default: 30
      label:
        type: string
        default: ''

A tiny "resolve parameters" step maps those inputs (or their defaults, for the nightly run) into env vars, so the rest of the workflow is unchanged. Nightly behaves exactly as before; a caller can point it at a different prefix, retention, and filename label.

There's a bonus safety property here that duplication would have thrown away: the workflow keeps its concurrency group. A pre-deploy backup and the nightly backup can now never run at the same time and race on the database's trusted-source firewall rules — one run's cleanup could otherwise remove the other's still-in-use IP. Reuse isn't just DRY; it's safer.

Step 2: Split build from go-live

The key restructure in the deploy workflow: the build job pushes only immutable tags — never the tag Watchtower watches.

jobs:
  build:
    name: Build, Test & Push (:sha)
    runs-on: ubuntu-latest
    steps:
      # ... checkout, JDK, gradle test, bootJar, docker build ...
      - name: Build and Push Docker Image (immutable tags only)
        uses: docker/build-push-action@v5
        with:
          push: true
          tags: |
            ${{ env.REGISTRY }}/${{ env.IMAGE_NAME }}:${{ github.sha }}
            ${{ env.REGISTRY }}/${{ env.IMAGE_NAME }}:${{ github.run_number }}
          # NOTE: deliberately no :latest here.

Pushing :sha puts the image in the registry but triggers nothing — Watchtower only watches :latest.

Step 3: Backup between build and go-live

  predeploy-backup:
    name: Pre-deploy DB backup
    needs: build
    uses: ./.github/workflows/DigitalOcean-460-backup.yml
    secrets: inherit
    with:
      prefix: db-predeploy-backup
      lifecycle_days: 14
      label: predeploy-${{ github.sha }}

needs: build means it only runs after a green build+test. secrets: inherit passes the DO tokens through. The result lands at s3://.../db-predeploy-backup/jo4db-<ts>-predeploy-<sha>.sql.gz — labelled with the exact commit, so finding the right restore point later is trivial.

Step 4: Promote :latest last — that's the deploy trigger

  deploy:
    name: Promote :latest & Verify
    needs: predeploy-backup
    runs-on: ubuntu-latest
    steps:
      - name: Promote image to :latest (triggers Watchtower)
        run: |
          docker buildx imagetools create \
            --tag ${{ env.REGISTRY }}/${{ env.IMAGE_NAME }}:latest \
            ${{ env.REGISTRY }}/${{ env.IMAGE_NAME }}:${{ github.sha }}
      # ... wait for Watchtower, health-check the deployed SHA ...

docker buildx imagetools create is the quiet hero: it adds the :latest tag to the already-built manifest, server-side. No rebuild, no pull. Tagging it is the single, deliberate act that makes the app go live.

The job graph reads exactly like the invariant we wanted:

build ──▶ predeploy-backup ──▶ deploy(:latest)
 (test)      (restore point)      (migration)

Why the gate is unskippable

Walk the failure modes:

  • Tests fail → build fails → backup and deploy are skipped. No backup wasted, nothing ships.
  • Backup fails → deploy is skipped → :latest never moves → no migration. Your change simply doesn't go live until you fix the backup. It cannot half-deploy.
  • Backup succeeds, deploy proceeds → the migration runs with a restore point that's seconds old.

That last one is the whole point. The only time you reach for this backup is a bad migration — and now there's always one waiting, tagged with the commit that caused it.

Lessons learned

  • Reuse the sensitive workflow, don't fork it. The shared concurrency group prevented a firewall race we didn't even set out to fix.
  • Understand what triggers your deploy. For pull-based deploys, controlling which tag moves and when is how you sequence work around the go-live moment.
  • A gate is only a gate if failure blocks. needs: turns "we take a backup" into "we cannot deploy without one."
  • Label backups with the commit SHA. Future-you, mid-incident, will not want to guess which .sql.gz is the right one.

How do you sequence backups around migrations? Pre-deploy snapshot, blue/green, or just trust the nightly? Curious what's working for others.